06 Oct Underground utility risk in grid interconnection projects
Reduce buried utility risk in gen-tie, collector and substation design with a staged investigation plan, 3D mapping and targeted verification....
Reduce buried utility risk in gen-tie, collector and substation design with a staged investigation plan, 3D mapping and targeted verification....
Electric utilities across the U.S. are planning massive investments in the coming years to simultaneously address several related economic, environmental and technological forces. First, utilities need to upgrade aging infrastructure with equipment that is better able to withstand the severe weather patterns...
When asked to describe our nation’s aging infrastructure, most people would likely complain about the potholes in their neighborhoods or the transit systems that are always running late. Yet hiding beneath our feet is one of the most vital components of the...
What do you picture when you think of renewable energy? Wind power? Hydropower? Geothermal power? If you’re like me, you imagine a dispersed network of gleaming solar panels, a soaring wind turbine, a massive dam and a subterranean hot-water reservoir. As our society...
With rapid expansion of the electric vehicle (EV) marketplace, most owners still charge their EVs at home or at work, where some employers have installed chargers. Others park overnight or “top off” on short local trips at public charging stations, such as...
According to the American Society of Civil Engineering (ASCE), our nation’s infrastructure earned a C- in 2021. While this is the first time in 20 years that U.S. infrastructure risen above a D, such low grades continue to impede national economic growth...
Civil infrastructure and energy capital projects are notorious for experiencing delays and cost overruns. As the following chart, prepared by McKinsey & Co. using the HIS Herold’s Global Projects Database, shows, most construction projects are delayed by an average of 20+ months...