{"id":370,"date":"2022-01-21T18:48:39","date_gmt":"2022-01-21T18:48:39","guid":{"rendered":"http:\/\/35.232.79.154\/?p=370"},"modified":"2026-10-05T14:05:00","modified_gmt":"2026-10-05T19:05:00","slug":"the-standard-lorem-ipsum-passage-used-since-the-1500s-3","status":"publish","type":"post","link":"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/","title":{"rendered":"Electric vehicle charging infrastructure \u2013 a merciless bottleneck"},"content":{"rendered":"<p style=\"text-align: left;\">With rapid expansion of the electric vehicle (EV) marketplace, most owners still charge their EVs at home or at work, where some employers have installed chargers. Others park overnight or \u201ctop off\u201d on short local trips at public charging stations, such as parking garages, retail parking lots and converted light poles on street curbs. However, one of the main barriers to mass EV adoption remains the potential customer\u2019s concerns about how far an EV can go on a single charge \u2013 so-called \u201crange anxiety.\u201d<\/p>\n<p style=\"text-align: left;\">The exact number of public charging stations that will be required to support the market demand for EVs and achieve environmental goals in the coming decades is unknown. But one industry analyst forecasts explosive growth of this caliber: from about 1.3 million in 2020 to 40 million in 2030 and 200 million in 2050. Both public and private sectors worldwide are currently investing billions of dollars in EV charging stations and related infrastructure to quell range anxiety and herald the broad adoption of EVs. In the U.S., the Biden bill signed into law on November 15, 2021 allocates $7.5 billion for EV infrastructure. States like Massachusetts, home to Prezerv headquarters, are working hard with public utilities to build out EV infrastructure in order to meet their ambitious goals for electrifying transportation over the next decade.<\/p>\n<p style=\"text-align: left;\">Turning now to the nitty-gritty details of satisfying EV customer demand: All of these public charging stations must undergo permitting\/approval and construction processes, including making sufficient electrical upgrades and connections to the established power grid. In many cases, the permitting process involves months of discussions with various entities such as the Department of Transportation, municipality review committees and conservation boards. On the construction side, building each EV charging station necessitates digging an underground trench and laying down conduits to connect the charging station to the electric grid. This process can be particularly challenging and time-consuming in old, densely populated cities where contractors are forced to rely on outdated, inaccurate maps of underground infrastructure. Underground construction under such conditions raise safety hazards, project delays and cost overruns.<\/p>\n<p style=\"text-align: left;\">The Prezerv\u2019s Voxler platform and Build Safe application are built to help shorten the design and review process and make the construction project safer and faster. By helping to accelerate the buildout of the EV charging infrastructure, the Prezerv team is proud to support net-zero goal and creation of environmentally sustainable communities.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With rapid expansion of the electric vehicle (EV) marketplace, most owners still charge their EVs at home or at work, where some employers have installed chargers. Others park overnight or \u201ctop off\u201d on short local trips at public charging stations, such as&#8230;<\/p>\n","protected":false},"author":7,"featured_media":1278,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[6],"tags":[],"class_list":["post-370","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-insights"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.2.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"EV chargers may grow from 1.3 million in 2020 to 40 million by 2030. Each one needs permits, grid connections and digging around poorly mapped utilities.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Dr. Cam Raufi\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.2.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Prezerv Technologies - Mapping the underground for faster, safer infrastructure projects.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Electric vehicle charging infrastructure \u2013 a merciless bottleneck - Prezerv Technologies\" \/>\n\t\t<meta property=\"og:description\" content=\"EV chargers may grow from 1.3 million in 2020 to 40 million by 2030. Each one needs permits, grid connections and digging around poorly mapped utilities.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/prezerv.ai\/wp-content\/uploads\/2026\/10\/Prezerv-logo-vertical-trimmed2.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/prezerv.ai\/wp-content\/uploads\/2026\/10\/Prezerv-logo-vertical-trimmed2.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1831\" \/>\n\t\t<meta property=\"og:image:height\" content=\"1542\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2022-01-21T18:48:39+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-05T19:05:00+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Electric vehicle charging infrastructure \u2013 a merciless bottleneck - Prezerv Technologies\" \/>\n\t\t<meta name=\"twitter:description\" content=\"EV chargers may grow from 1.3 million in 2020 to 40 million by 2030. Each one needs permits, grid connections and digging around poorly mapped utilities.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/prezerv.ai\/wp-content\/uploads\/2026\/10\/Prezerv-logo-vertical-trimmed2.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/2022\\\/01\\\/21\\\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\\\/#blogposting\",\"name\":\"Electric vehicle charging infrastructure \\u2013 a merciless bottleneck - Prezerv Technologies\",\"headline\":\"Electric vehicle charging infrastructure \\u2013 a merciless bottleneck\",\"author\":{\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/author\\\/cam-raufi\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/prezerv.ai\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/prezerv.ai\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/map-ai-article-EV-charging-stations-scaled.jpeg\",\"width\":2560,\"height\":1440,\"caption\":\"Parking electric cars. Charging stations, fast charging cars. 3d illustratin. High quality photo\"},\"datePublished\":\"2022-01-21T18:48:39-05:00\",\"dateModified\":\"2026-10-05T14:05:00-05:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/2022\\\/01\\\/21\\\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/2022\\\/01\\\/21\\\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\\\/#webpage\"},\"articleSection\":\"Insights\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/2022\\\/01\\\/21\\\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/prezerv.ai\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/prezerv.ai\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/category\\\/insights\\\/#listItem\",\"name\":\"Insights\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/category\\\/insights\\\/#listItem\",\"position\":2,\"name\":\"Insights\",\"item\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/category\\\/insights\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/2022\\\/01\\\/21\\\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\\\/#listItem\",\"name\":\"Electric vehicle charging infrastructure \\u2013 a merciless bottleneck\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/prezerv.ai\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/2022\\\/01\\\/21\\\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\\\/#listItem\",\"position\":3,\"name\":\"Electric vehicle charging infrastructure \\u2013 a merciless bottleneck\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/category\\\/insights\\\/#listItem\",\"name\":\"Insights\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/prezerv.ai\\\/#organization\",\"name\":\"Prezerv Technologies\",\"description\":\"Prezerv Technologies provides AI-powered 3D mapping and inspection technologies for underground infrastructure. Its products help owners and operators plan, build, operate, and maintain their infrastructure assets faster and safer.\",\"url\":\"https:\\\/\\\/prezerv.ai\\\/\",\"email\":\"support@prezerv.ai\",\"telephone\":\"+16172864649\",\"foundingDate\":\"2021-01-04\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":20,\"maxValue\":100},\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/prezerv.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Prezerv-logo-vertical-trimmed2.png\",\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/2022\\\/01\\\/21\\\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\\\/#organizationLogo\",\"width\":1831,\"height\":1542},\"image\":{\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/2022\\\/01\\\/21\\\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/prezerv\\\/\",\"https:\\\/\\\/www.crunchbase.com\\\/organization\\\/prezerv-technologies-3528\",\"https:\\\/\\\/archgrants.org\\\/companies\\\/prezerv-technologies\\\/\",\"https:\\\/\\\/gridcatalyst.org\\\/portfolio\\\/prezerv\\\/\",\"https:\\\/\\\/pitchbook.com\\\/profiles\\\/company\\\/503073-82\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/author\\\/cam-raufi\\\/#author\",\"url\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/author\\\/cam-raufi\\\/\",\"name\":\"Dr. Cam Raufi\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/2022\\\/01\\\/21\\\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/299075001f28429717a4f5ecd7616461ef155d8d971ef7f7966aee28dbba1f63?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Dr. Cam Raufi\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/in\\\/cam-raufi\"]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/2022\\\/01\\\/21\\\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\\\/#webpage\",\"url\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/2022\\\/01\\\/21\\\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\\\/\",\"name\":\"Electric vehicle charging infrastructure \\u2013 a merciless bottleneck - Prezerv Technologies\",\"description\":\"EV chargers may grow from 1.3 million in 2020 to 40 million by 2030. Each one needs permits, grid connections and digging around poorly mapped utilities.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/prezerv.ai\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/2022\\\/01\\\/21\\\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/author\\\/cam-raufi\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/author\\\/cam-raufi\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/prezerv.ai\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/map-ai-article-EV-charging-stations-scaled.jpeg\",\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/2022\\\/01\\\/21\\\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\\\/#mainImage\",\"width\":2560,\"height\":1440,\"caption\":\"Parking electric cars. Charging stations, fast charging cars. 3d illustratin. High quality photo\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/prezerv.ai\\\/index.php\\\/2022\\\/01\\\/21\\\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\\\/#mainImage\"},\"datePublished\":\"2022-01-21T18:48:39-05:00\",\"dateModified\":\"2026-10-05T14:05:00-05:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/prezerv.ai\\\/#website\",\"url\":\"https:\\\/\\\/prezerv.ai\\\/\",\"name\":\"Prezerv Technologies\",\"alternateName\":\"Prezerv\",\"description\":\"Mapping the underground for faster, safer infrastructure projects.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/prezerv.ai\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Electric vehicle charging infrastructure \u2013 a merciless bottleneck - Prezerv Technologies","description":"EV chargers may grow from 1.3 million in 2020 to 40 million by 2030. Each one needs permits, grid connections and digging around poorly mapped utilities.","canonical_url":"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/#blogposting","name":"Electric vehicle charging infrastructure \u2013 a merciless bottleneck - Prezerv Technologies","headline":"Electric vehicle charging infrastructure \u2013 a merciless bottleneck","author":{"@id":"https:\/\/prezerv.ai\/index.php\/author\/cam-raufi\/#author"},"publisher":{"@id":"https:\/\/prezerv.ai\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-scaled.jpeg","width":2560,"height":1440,"caption":"Parking electric cars. Charging stations, fast charging cars. 3d illustratin. High quality photo"},"datePublished":"2022-01-21T18:48:39-05:00","dateModified":"2026-10-05T14:05:00-05:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/#webpage"},"isPartOf":{"@id":"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/#webpage"},"articleSection":"Insights"},{"@type":"BreadcrumbList","@id":"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/prezerv.ai\/#listItem","position":1,"name":"Home","item":"https:\/\/prezerv.ai\/","nextItem":{"@type":"ListItem","@id":"https:\/\/prezerv.ai\/index.php\/category\/insights\/#listItem","name":"Insights"}},{"@type":"ListItem","@id":"https:\/\/prezerv.ai\/index.php\/category\/insights\/#listItem","position":2,"name":"Insights","item":"https:\/\/prezerv.ai\/index.php\/category\/insights\/","nextItem":{"@type":"ListItem","@id":"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/#listItem","name":"Electric vehicle charging infrastructure \u2013 a merciless bottleneck"},"previousItem":{"@type":"ListItem","@id":"https:\/\/prezerv.ai\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/#listItem","position":3,"name":"Electric vehicle charging infrastructure \u2013 a merciless bottleneck","previousItem":{"@type":"ListItem","@id":"https:\/\/prezerv.ai\/index.php\/category\/insights\/#listItem","name":"Insights"}}]},{"@type":"Organization","@id":"https:\/\/prezerv.ai\/#organization","name":"Prezerv Technologies","description":"Prezerv Technologies provides AI-powered 3D mapping and inspection technologies for underground infrastructure. Its products help owners and operators plan, build, operate, and maintain their infrastructure assets faster and safer.","url":"https:\/\/prezerv.ai\/","email":"support@prezerv.ai","telephone":"+16172864649","foundingDate":"2021-01-04","numberOfEmployees":{"@type":"QuantitativeValue","minValue":20,"maxValue":100},"logo":{"@type":"ImageObject","url":"https:\/\/prezerv.ai\/wp-content\/uploads\/2026\/10\/Prezerv-logo-vertical-trimmed2.png","@id":"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/#organizationLogo","width":1831,"height":1542},"image":{"@id":"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/#organizationLogo"},"sameAs":["https:\/\/www.linkedin.com\/company\/prezerv\/","https:\/\/www.crunchbase.com\/organization\/prezerv-technologies-3528","https:\/\/archgrants.org\/companies\/prezerv-technologies\/","https:\/\/gridcatalyst.org\/portfolio\/prezerv\/","https:\/\/pitchbook.com\/profiles\/company\/503073-82"]},{"@type":"Person","@id":"https:\/\/prezerv.ai\/index.php\/author\/cam-raufi\/#author","url":"https:\/\/prezerv.ai\/index.php\/author\/cam-raufi\/","name":"Dr. Cam Raufi","image":{"@type":"ImageObject","@id":"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/299075001f28429717a4f5ecd7616461ef155d8d971ef7f7966aee28dbba1f63?s=96&d=mm&r=g","width":96,"height":96,"caption":"Dr. Cam Raufi"},"sameAs":["https:\/\/www.linkedin.com\/in\/cam-raufi"]},{"@type":"WebPage","@id":"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/#webpage","url":"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/","name":"Electric vehicle charging infrastructure \u2013 a merciless bottleneck - Prezerv Technologies","description":"EV chargers may grow from 1.3 million in 2020 to 40 million by 2030. Each one needs permits, grid connections and digging around poorly mapped utilities.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/prezerv.ai\/#website"},"breadcrumb":{"@id":"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/#breadcrumblist"},"author":{"@id":"https:\/\/prezerv.ai\/index.php\/author\/cam-raufi\/#author"},"creator":{"@id":"https:\/\/prezerv.ai\/index.php\/author\/cam-raufi\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-scaled.jpeg","@id":"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/#mainImage","width":2560,"height":1440,"caption":"Parking electric cars. Charging stations, fast charging cars. 3d illustratin. High quality photo"},"primaryImageOfPage":{"@id":"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/#mainImage"},"datePublished":"2022-01-21T18:48:39-05:00","dateModified":"2026-10-05T14:05:00-05:00"},{"@type":"WebSite","@id":"https:\/\/prezerv.ai\/#website","url":"https:\/\/prezerv.ai\/","name":"Prezerv Technologies","alternateName":"Prezerv","description":"Mapping the underground for faster, safer infrastructure projects.","inLanguage":"en-US","publisher":{"@id":"https:\/\/prezerv.ai\/#organization"}}]},"og:locale":"en_US","og:site_name":"Prezerv Technologies - Mapping the underground for faster, safer infrastructure projects.","og:type":"article","og:title":"Electric vehicle charging infrastructure \u2013 a merciless bottleneck - Prezerv Technologies","og:description":"EV chargers may grow from 1.3 million in 2020 to 40 million by 2030. Each one needs permits, grid connections and digging around poorly mapped utilities.","og:url":"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/","og:image":"https:\/\/prezerv.ai\/wp-content\/uploads\/2026\/10\/Prezerv-logo-vertical-trimmed2.png","og:image:secure_url":"https:\/\/prezerv.ai\/wp-content\/uploads\/2026\/10\/Prezerv-logo-vertical-trimmed2.png","og:image:width":1831,"og:image:height":1542,"article:published_time":"2022-01-21T18:48:39+00:00","article:modified_time":"2026-10-05T19:05:00+00:00","twitter:card":"summary","twitter:title":"Electric vehicle charging infrastructure \u2013 a merciless bottleneck - Prezerv Technologies","twitter:description":"EV chargers may grow from 1.3 million in 2020 to 40 million by 2030. Each one needs permits, grid connections and digging around poorly mapped utilities.","twitter:image":"https:\/\/prezerv.ai\/wp-content\/uploads\/2026\/10\/Prezerv-logo-vertical-trimmed2.png"},"aioseo_meta_data":{"post_id":"370","title":null,"description":"EV chargers may grow from 1.3 million in 2020 to 40 million by 2030. Each one needs permits, grid connections and digging around poorly mapped utilities.","keywords":null,"keyphrases":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":0,"frequency":"default","local_seo":null,"limit_modified_date":false,"created":"2022-04-26 22:16:49","updated":"2026-10-05 21:13:15","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"primary_term":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/prezerv.ai\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/prezerv.ai\/index.php\/category\/insights\/\" title=\"Insights\">Insights<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tElectric vehicle charging infrastructure \u2013 a merciless bottleneck\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/prezerv.ai\/"},{"label":"Insights","link":"https:\/\/prezerv.ai\/index.php\/category\/insights\/"},{"label":"Electric vehicle charging infrastructure \u2013 a merciless bottleneck","link":"https:\/\/prezerv.ai\/index.php\/2022\/01\/21\/the-standard-lorem-ipsum-passage-used-since-the-1500s-3\/"}],"rttpg_featured_image_url":{"full":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-scaled.jpeg",2560,1440,false],"landscape":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-scaled.jpeg",2560,1440,false],"portraits":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-scaled.jpeg",2560,1440,false],"thumbnail":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-150x150.jpeg",150,150,true],"medium":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-300x169.jpeg",300,169,true],"large":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-1024x576.jpeg",1024,576,true],"1536x1536":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-1536x864.jpeg",1536,864,true],"2048x2048":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-2048x1152.jpeg",2048,1152,true],"portfolio-square":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-570x570.jpeg",570,570,true],"portfolio-portrait":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-600x800.jpeg",600,800,true],"portfolio-landscape":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-800x600.jpeg",800,600,true],"menu-featured-post":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-345x198.jpeg",345,198,true],"qode-carousel_slider":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-400x260.jpeg",400,260,true],"portfolio_slider":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-500x380.jpeg",500,380,true],"portfolio_masonry_regular":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-500x500.jpeg",500,500,true],"portfolio_masonry_wide":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-1000x500.jpeg",1000,500,true],"portfolio_masonry_tall":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-500x1000.jpeg",500,1000,true],"portfolio_masonry_large":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-1000x1000.jpeg",1000,1000,true],"portfolio_masonry_with_space":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-700x394.jpeg",700,394,true],"latest_post_boxes":["https:\/\/prezerv.ai\/wp-content\/uploads\/2022\/02\/map-ai-article-EV-charging-stations-539x303.jpeg",539,303,true]},"rttpg_author":{"display_name":"Dr. Cam Raufi","author_link":"https:\/\/prezerv.ai\/index.php\/author\/cam-raufi\/"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/prezerv.ai\/index.php\/category\/insights\/\" rel=\"category tag\">Insights<\/a>","rttpg_excerpt":"With rapid expansion of the electric vehicle (EV) marketplace, most owners still charge their EVs at home or at work, where some employers have installed chargers. Others park overnight or \u201ctop off\u201d on short local trips at public charging stations, such as...","_links":{"self":[{"href":"https:\/\/prezerv.ai\/index.php\/wp-json\/wp\/v2\/posts\/370","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/prezerv.ai\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/prezerv.ai\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/prezerv.ai\/index.php\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/prezerv.ai\/index.php\/wp-json\/wp\/v2\/comments?post=370"}],"version-history":[{"count":8,"href":"https:\/\/prezerv.ai\/index.php\/wp-json\/wp\/v2\/posts\/370\/revisions"}],"predecessor-version":[{"id":1240,"href":"https:\/\/prezerv.ai\/index.php\/wp-json\/wp\/v2\/posts\/370\/revisions\/1240"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/prezerv.ai\/index.php\/wp-json\/wp\/v2\/media\/1278"}],"wp:attachment":[{"href":"https:\/\/prezerv.ai\/index.php\/wp-json\/wp\/v2\/media?parent=370"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/prezerv.ai\/index.php\/wp-json\/wp\/v2\/categories?post=370"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/prezerv.ai\/index.php\/wp-json\/wp\/v2\/tags?post=370"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}